A meeting was held in the Rivne region with the heads of territorial communities to discuss preparations for the autumn-winter period.
This is reported by Rivne24
As of today, the region has prepared 969 boiler houses, 84 central heating points, and 375 km of heating networks.
- 8 boiler houses and 71 boilers have been overhauled.
- 21 boilers and 8.5 km of heating networks have been replaced.
A total of 150 million UAH has been allocated for the implementation of these measures.
In addition, to ensure heating in the region, 1545 tons of coal, 63743 cubic meters of firewood, and 2576 tons of pellets have been stockpiled.