In Rivne, work is ongoing to prepare the children’s railway for the new season. Employees of “Ukrzaliznytsia” are carrying out a series of measures, including the replacement of rails and sleepers, as well as the modernization of the stop. At the same time, municipal services are engaged in improving the surrounding area.
This is reported by Rivne24
As part of the preparations, emergency trees and self-seeded plantings along the tracks have been removed, and the water body has been cleared of debris and broken branches. Future plans include the establishment of a pedestrian path along the track, which will provide comfortable walks for residents.